USACE mitigation bankingGreat Lakes & Ohio River Division

How long the LRD division's districts take to approve a mitigation bank, what credit supply they oversee, and how the districts differ from one another. The clock that matters is the regulator's own — everything else includes time the applicant spends revising.

Figures mirrored from USACE RIBITS · ORM · RRS · synced

The read

A bank clears the regulator here in about 9 months — and takes roughly 1.7 years end to end.

Measured against the national median, the regulator clock sits level with it (0.91×) and the full clock sits level with it (0.98×). Districts diverge sharply enough that the division median is a starting point, not a forecast for any one office — Huntington closes in 223 days, Louisville in 544.

Regulator clock
260days, median
Draft instrument to decision
n = 43 banks · IQR 186–518
Full clock
627days, median
First public notice to decision
n = 52 banks
Vs national
Regulator: Great Lakes & Ohio River 260 days; National 287 days. Full: Great Lakes & Ohio River 627 days; National 638 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

7 districts
Review time by district, 7 rows
CodeDistrictRegulator clockFull clockBanks
CodeLRHHuntingtonRegulator clock223 daysFull clock479 daysBanks10
CodeLRNNashvilleRegulator clock315 daysFull clock788 daysBanks20
CodeLRLLouisvilleRegulator clock544 daysFull clock785 daysBanks11
CodeLRBBuffaloRegulator clocknot enough dataFull clocknot enough dataBanks3
CodeLRCChicagoRegulator clocknot enough dataFull clock518 daysBanks4
CodeLREDetroitRegulator clocknot enough dataFull clocknot enough dataBanks1
CodeLRPPittsburghRegulator clocknot enough dataFull clocknot enough dataBanks3
Supply

Credits available across the division

Wetland
1,850credits
+51.8%year on year
Stream
409,051credits
+16.1%year on year
Species
7,202credits
0.0%year on year
Demand

Permit applications by district

7 districts
Permit applications by district, 7 rows
CodeDistrictApplicationsOpenShare of division
CodeLREDetroitApplications13Open3Share of division19%
CodeLRBBuffaloApplications11Open1Share of division16%
CodeLRHHuntingtonApplications11Open3Share of division16%
CodeLRLLouisvilleApplications9Open0Share of division13%
CodeLRNNashvilleApplications9Open2Share of division13%
CodeLRCChicagoApplications8Open1Share of division12%
CodeLRPPittsburghApplications7Open0Share of division10%

Recent federal permit applications on public notice

6 most recent of 68
Applications recorded
68since 2026-07-02
Standard permits & EIS · across 7 districts
Open for comment
10of 68
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-11-18DistrictLRBGeneva on the Lake (formerly: Geneva Township Park Commission)
Shoreline work (details not specified)more

shoreline work

Comment periodOpen · to 2026-12-18
Applied2026-11-18DistrictLREConsumers Energy, Campbell Plant - Maintenance Dredging, Beach Nourishment
Maintenance dredging with beach nourishment, Pigeon Lake, West Olive, MImore

Proposed maintenance dredging and discharge of dredged material (beach nourishment) within Lake Michigan (Pigeon Lake) in West Olive, Michigan.

Comment periodOpen · to 2026-12-08
Applied2026-11-18DistrictLREGull Island, LLC - Boat Basin Rehab
Boat basin expansion, dock replacement and fill in Lake Huronmore

Proposed Boat Basin Expansion, Dock Replacement and Fill Material Discharge in Lake Huron in Drummond Island, Michigan

Comment periodOpen · to 2026-12-17
Applied2026-11-17DistrictLRHRobert C. Byrd Locks and Dam Hydroelectric Project
Second notice: revised impacts, including 5 added acres of riprapmore

2nd public notice was posted due to changes to proposed impacts including the addition of 5 acres of riprap.

Comment periodOpen · to 2026-12-02
Applied2026-11-16DistrictLRNOklo Nuclear Recycling Facility
Advanced fuels center development in Oak Ridge, Tennesseemore

Proposed development of advanced fuels center in Oak Ridge, Roane County, Tennessee

Comment periodOpen · to 2026-11-30
Applied2026-11-13DistrictLREPointe Marina - Bank Stabilization, Dock Replacement, Dredging and Wave Attenuators
Bulkhead replacement, dock replacement, dredging and riprap at Belle Maer canals marinamore

Install a turbidity curtain to enclose the project area. Replace approximately 3998.5 linear feet of the existing fence and pipe bulkhead with sheet steel bulkhead. Discharge approximately 140 cubic yards of clean fill landward of the new bulkhead. Remove & replace the 251 existing docks of varying lengths with 225 floating docks including the shared canal with Belle Maer Marina; 43 in the shared canal, 97 in the east canal, 48 in the middle canal and 23 in the west canal. Dredge, by mechanical means, a maximum of 5,000 cubic yards of sediment to a maximum depth of approximately 1.3 feet below the Low Water Datum (LWD) elevation 572.3 feet (IGLD 1985) within over a period of 5 years with the initial dredge amount for year 1approximately 1571 cubic yards. Discharge approximately 702 cubic yards of riprap in 790-foot-long x 12-foot-wide area along the Conger/Belvidere Bay frontage. Discharge approximately 276 cubic yards of riprap in a 310-foot-long x 12-foot-wide area a

Comment periodOpen · to 2026-11-28
Pipeline

Banks proposed on public notice

5 most recent of 35
Proposals recorded
35since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
6of 35
The rest have closed, and remain in review
In RIBITS review
10pending banks
Separate feed — RIBITS bank status
Banks proposed on public notice, 5 rows
AppliedDistrictTypeProposed bankComment period
Applied2026-11-17DistrictLRLTypeILF instrument modificationMODKDFWR ILF Program
Stream restoration and riparian buffer at Green River headwatersmore

The project proposes to preserve, enhance, rehabilitate, and re-establish stable and self-sustaining ephemeral, intermittent, and perennial streams, along with woody riparian corridor establishment and protection, within the project site, the headwaters of the Green River.

Comment periodOpen · to 2026-12-18
Applied2026-11-13DistrictLRLTypeILF instrument modificationMODKDFWR ILF Program
Stream restoration and preservation, about 44,000 linear feet, with riparian enhancementmore

The applicant requests authorization for the discharge of fill material into Waters of the U.S. for the restoration and preservation of approximately 25,189 linear feet (lf) of ephemeral stream, 15,119 lf of intermittent stream, and 3,836 lf of perennial stream. The proposal also includes upland riparian habitat enhancement.

Comment periodOpen · to 2026-12-14
Applied2026-11-13DistrictLRLTypeILF instrument modificationMODNorthern Kentucky University Center for Environmental Restoration In-lieu Fee (NKU-CER-ILF) Program (LRL-2010-00326
Stream restoration and preservation of about 16,300 feet with conservation easement, Boone Conservancymore

The applicant requests authorization for the discharge of fill material into Waters of the U.S. for the restoration and preservation of approximately 13,282 linear feet (lf) of ephemeral stream, 1,602 lf of intermittent stream, and 1,415 lf of perennial stream. The proposal also includes upland riparian habitat enhancement. The project site would be permanently protected through implementation of conservation easement administered by The Boone Conservancy. All incompatible uses, including mineral extraction, would be prohibited.

Comment periodOpen · to 2026-12-14
Applied2026-11-12DistrictLRCTypeBank prospectusDEVMBARay Lake Wetland Mitgation Bank
Proposed wetland mitigation bank in Chicago Districtmore

Public Notice for proposed wetland mitigation bank within Chicago District Corps boundaries.

Comment periodOpen · to 2026-12-12
Applied2026-11-06DistrictLRHTypeBank prospectusDEVMBALower Kanawha Mitigation Bank - Naturion
Proposed mitigation bank in West Virginiamore

Notice of proposed mitigation bank in West Virginia.

Comment periodOpen · to 2026-12-06
Approvals

Banks finalized in this division

8 of 16
Banks finalized in this division, 8 rows
DecisionDistrictBankStatus nowCredits released
Decision2026-11-17DistrictLRNLittle Cane Creek Mitigation Bank LRN-2024-350Status nowApprovedCredits releasednone yet
Decision2026-11-05DistrictLRNBonne Terre Wetland Mitigation BankLRN-2024-237Status nowApprovedCredits releasednone yet
Decision2026-10-31DistrictLRBStream + Wetlands Foundation - Three Rivers Wetlands Mitigation BankLRB-2023-22Status nowPendingCredits releasednone yet
Decision2026-10-15DistrictLRPKoncsol Mitigation BankLRP-2025-264Status nowPendingCredits releasednone yet
Decision2026-10-14DistrictLRHDick Branch Mitigation BankLRH-2025-318Status nowApprovedCredits releasednone yet
Decision2026-09-25DistrictLRNSmith Hollow Mitigation BankLRN-2024-97Status nowApprovedCredits releasednone yet
Decision2026-09-24DistrictLRHCrooked Creek Mitigation BankLRH-2024-201Status nowPendingCredits releasednone yet
Decision2026-08-26DistrictLRNRoller Stream & Wetland Mitigation BankLRN-2023-663Status nowApprovedCredits releasednone yet

About the data on this page

Bank details and credit balances are mirrored from USACE RIBITS. Supply figures exclude single-client banks and banks that cannot currently sell; credit classes are kept separate.

Approval timelines use USACE ORM milestone dates and exclude in-lieu fee instruments. A median is shown only when enough records carry the dates needed to calculate it.

Public notices come from USACE RRS; MitiVision’s one-line notice labels are AI-generated summaries of the Corps’ text.

How these figures are builtReport an issue