USACE mitigation bankingGreat Lakes & Ohio River Division

How long the LRD division's districts take to approve a mitigation bank, what credit supply they oversee, and how the districts differ from one another. The clock that matters is the regulator's own — everything else includes time the applicant spends revising.

Figures mirrored from USACE RIBITS · ORM · RRS · synced

The read

A bank clears the regulator here in about 10 months — and takes roughly 1.8 years end to end.

Measured against the national median, the regulator clock sits level with it (1.04×) and the full clock sits level with it (0.90×). Districts diverge sharply enough that the division median is a starting point, not a forecast for any one office — Huntington closes in 231 days, Louisville in 547.

Regulator clock
315days, median
Draft instrument to decision
n = 36 banks · IQR 188–525
Full clock
653days, median
First public notice to decision
n = 44 banks
Vs national
Regulator: Great Lakes & Ohio River 315 days; National 303 days. Full: Great Lakes & Ohio River 653 days; National 723 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

7 districts
Review time by district, 7 rows
CodeDistrictRegulator clockFull clockBanks
CodeLRHHuntingtonRegulator clock231 daysFull clock466 daysBanks9
CodeLRNNashvilleRegulator clock334 daysFull clock768 daysBanks18
CodeLRLLouisvilleRegulator clock547 daysFull clock983 daysBanks9
CodeLRBBuffaloRegulator clocknot enough dataFull clocknot enough dataBanks2
CodeLRCChicagoRegulator clocknot enough dataFull clock518 daysBanks4
CodeLREDetroitRegulator clocknot enough dataFull clocknot enough dataBanks1
CodeLRPPittsburghRegulator clocknot enough dataFull clocknot enough dataBanks1
Supply

Credits available across the division

Wetland
1,790credits
+59.4%year on year
Stream
401,272credits
+27.1%year on year
Species
7,202credits
0.0%year on year
Demand

Permit applications by district

7 districts
Permit applications by district, 7 rows
CodeDistrictApplicationsOpenShare of division
CodeLRBBuffaloApplications7Open1Share of division16%
CodeLRLLouisvilleApplications7Open3Share of division16%
CodeLRPPittsburghApplications7Open2Share of division16%
CodeLRCChicagoApplications6Open2Share of division14%
CodeLREDetroitApplications6Open0Share of division14%
CodeLRNNashvilleApplications6Open3Share of division14%
CodeLRHHuntingtonApplications5Open1Share of division11%

Recent federal permit applications on public notice

6 most recent of 44
Applications recorded
44since 2026-07-02
Standard permits & EIS · across 7 districts
Open for comment
12of 44
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-09-24DistrictLRNGum Pond Quarry
Mine-through of 7.4 acres of wetlandsmore

PN26-27; Proposed mine through of 7.4 wetland acres.

Comment periodOpen · to 2026-10-26
Applied2026-09-24DistrictLRHNWP39 Buck Canyon Site
Proposed activity affecting waters near Sprigg Township, Adams County OHmore

Public Notice of proposed activity that would affect waters of the United States associated with the Ohio River watershed. The proposed project/review area is located east of Ginger Ridge Road and north of U.S. Route 52 in Sprigg Township, Adams County, Ohio with approximate center coordinates of 38.646748 latitude, -83.659828 longitude.

Comment periodOpen · to 2026-10-24
Applied2026-09-22DistrictLRLMARINA VILLAGE DOCKOWNERS ASSOCIATION
Maintenance dredging at Marina Villagemore

Maitenance dredging of Marina Village.

Comment periodOpen · to 2026-10-22
Applied2026-09-16DistrictLRNProject Crucible
Fill for Cumberland River offloading facility serving new smelting plantmore

The applicant proposes to discharge fill material into the Cumberland River, three wetlands, and one stream to facilitate construction of a water-borne materials offloading facility (MOF), a laydown area, and a heavy haul road (HHR) which will allow the delivery and transport of over-sized materials associated with an integrated non-ferrous smelting and refining facility. A water intake structure and outfall structure will be constructed within the Cumberland River and a new aerial electrical transmission line will be installed across the Cumberland River and hung from existing powerline towers. There will be no deposition of fill material associated with the water intake and outfall structures or the electrical transmission line.

Comment periodOpen · to 2026-09-30
Applied2026-09-16DistrictLRNSavannah Marina (Tennessee River RM 190.3R), Hardin County, Tennessee
Savanna city-owned marina and commercial spacemore

Public notice 26-16 for LRN-2017-01098, proposed creation of the City of Savanna owned marina and commercial space.

Comment periodOpen · to 2026-10-15
Applied2026-09-15DistrictLRLLimestone Bay Yacht Club
Limestone Bay developmentmore

Limestone Bay

Comment periodOpen · to 2026-10-15
Pipeline

Banks proposed on public notice

5 most recent of 22
Proposals recorded
22since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
5of 22
The rest have closed, and remain in review
In RIBITS review
7pending banks
Separate feed — RIBITS bank status
Banks proposed on public notice, 5 rows
AppliedDistrictTypeProposed bankComment period
Applied2026-09-27DistrictLRNTypeBank prospectusDEVMBABeech Fork Mitigation Site - Emory Mitigation Bank
Mitigation bankmore

Mitigation bank

Comment periodOpen · to 2026-10-27
Applied2026-09-15DistrictLRLTypeBank prospectusDEVMBACandace Lee Fink - Phase II Mitigation Bank
Candace Lee Fink Mitigation Bank prospectus, Phase 2more

Prospectus for Candace Lee Fink Mitigation Bank. PHase 2

Comment periodOpen · to 2026-10-15
Applied2026-09-14DistrictLRBTypeILF instrument modificationMODThe Nature Conservancy In-Lieu Fee Program
Mitigation plan for Strong Acres in-lieu fee site developmentmore

A mitigation plan has been submitted for the proposed development of the Strong Acres In-lieu Fee (ILF) Site (Site), pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008). Department of Army authorization pursuant to Section 404 of the Clean Water Act would be required for any proposed wetland and/or stream mitigation activities that would result in a discharge of dredged or fill material into waters of the United States. The approximately 40.18-acre Strong Acres Site is located north of Kirtland Chardon Road, west of Booth Road, south of Booth Road and Sperry Road, and east of Sperry Road, Kirtland Township, Lake County, Ohio.

Comment periodOpen · to 2026-10-14
Applied2026-09-03DistrictLRLTypeBank prospectusDEVMBA* SD1-Northern Kentucky Stream and Wetland Umbrella Mitigation Bank
Public notice for UMBI mitigation bankmore

Public notice for UMBI

Comment periodOpen · to 2026-10-03
Applied2026-09-02DistrictLRLTypeBank prospectusDEVMBABuzzard Roost Stream and Wetland Mitigation Bank (LRL-2026-00164)
Kentucky Interagency Review Team comment solicitationmore

The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties, including participating agencies of the Kentucky Interagency Review Team (IRT), in order to consider and evaluate the impacts of this proposed activity.

Comment periodOpen · to 2026-10-02
Approvals

Banks finalized in this division

8 of 13
Banks finalized in this division, 8 rows
DecisionDistrictBankStatus nowCredits released
Decision2026-09-25DistrictLRNSmith Hollow Mitigation BankLRN-2024-97Status nowApprovedCredits releasednone yet
Decision2026-09-24DistrictLRHCrooked Creek Mitigation BankLRH-2024-201Status nowPendingCredits releasednone yet
Decision2026-08-26DistrictLRNRoller Stream & Wetland Mitigation BankLRN-2023-663Status nowApprovedCredits releasednone yet
Decision2026-08-22DistrictLRBDavey Mitigation - Two Yutes Wetland Mitigation BankLRB-2024-296Status nowApprovedCredits releasednone yet
Decision2026-07-08DistrictLRHS+W - Bloody Run Swamp North Wetlands Mitigation BankLRH-2025-514Status nowApprovedCredits releasedWetland
Decision2026-07-07DistrictLRHBig Island Wetland Mitigation BankLRH-2025-256Status nowApprovedCredits releasedWetland
Decision2026-06-27DistrictLRLEIP Rush Branch Stream Mitigation Bank LRL-2023-333Status nownot in RIBITSCredits releasedno record
Decision2026-06-18DistrictLRNHenry Creek Mitigation BankLRN-2024-720Status nowApprovedCredits releasednone yet

About the data on this page

Bank details, status and credit balances are mirrored from the USACE RIBITS registry, the federal public record for mitigation banks. Single-client banks are excluded from supply figures. Credit balances count only banks that can sell today — sold-out, suspended, terminated, withdrawn, closed-out and not-yet-approved banks are left out. Credit classes offset different resources and are never added together. Totals across many banks are rounded to whole credits — a single bank’s own balance never is. Approval timelines come from the USACE permit-processing record (ORM). We calculate the median from every bank’s milestone dates in the division. Full clock means from the first public notice of the prospectus to the final decision — it includes the applicant’s own time. Regulator clock means from the complete draft instrument being received to that same final decision — the part the Corps controls. A median is shown only where at least four banks have both milestone dates. In-lieu fee instruments are excluded throughout. Public notices come from the USACE Regulatory Request System (RRS). Notice text is the Corps’ own; the one-line summary beside it is an AI generated summary.

The map on this page is drawn live from the EPA NEPAssist RIBITS MapServer when you load it.

How these figures are builtReport an issue