How long the MVD division's districts take to approve a mitigation bank, what credit supply they oversee, and how the districts differ from one another. The clock that matters is the regulator's own — everything else includes time the applicant spends revising.

Figures mirrored from USACE RIBITS · ORM · RRS · synced

The read

A bank clears the regulator here in about 9 months — and takes roughly 1.7 years end to end.

Measured against the national median, the regulator clock sits level with it (0.95×) and the full clock runs 0.88× it — faster than the country. Districts diverge sharply enough that the division median is a starting point, not a forecast for any one office — St. Paul closes in 271 days, Memphis in 315.

Regulator clock
287days, median
Draft instrument to decision
n = 27 banks · IQR 213–369
Full clock
638days, median
First public notice to decision
n = 37 banks
Vs national
Regulator: Mississippi Valley 287 days; National 303 days. Full: Mississippi Valley 638 days; National 723 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

6 districts
Review time by district, 6 rows
CodeDistrictRegulator clockFull clockBanks
CodeMVPSt. PaulRegulator clock271 daysFull clock593 daysBanks18
CodeMVMMemphisRegulator clock315 daysFull clock958 daysBanks5
CodeMVKVicksburgRegulator clocknot enough dataFull clocknot enough dataBanks1
CodeMVNNew OrleansRegulator clocknot enough dataFull clock1,001 daysBanks4
CodeMVRRock IslandRegulator clocknot enough dataFull clock499 daysBanks7
CodeMVSSt. LouisRegulator clocknot enough dataFull clocknot enough dataBanks2
Supply

Credits available across the division

Wetland
57,038credits
−1.4%year on year
Stream
1,042,799credits
+20.9%year on year
Species
255credits
0.0%year on year
Demand

Permit applications by district

4 districts
Permit applications by district, 4 rows
CodeDistrictApplicationsOpenShare of division
CodeMVNNew OrleansApplications25Open3Share of division69%
CodeMVPSt. PaulApplications7Open0Share of division19%
CodeMVKVicksburgApplications2Open0Share of division6%
CodeMVMMemphisApplications2Open1Share of division6%

Recent federal permit applications on public notice

6 most recent of 36
Applications recorded
36since 2026-07-02
Standard permits & EIS · across 4 districts
Open for comment
4of 36
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-09-23DistrictMVMNewsom/relocate stream/Greene Co., AR
Relocate 4,550 ft of Henderson Creek channel for irrigationmore

The applicant is requesting a DA permit to fill and relocate approximately 4,550 linear feet of an old channel of Henderson Creek to improve irrigation efficiency at the project site. A new channel that will total approximately 5,400 linear feet would be created on-site to replace the existing tributary. Fill for the existing tributary will come from the excavation of the new channel and surrounding crop field. The existing channel has a riparian buffer that consists of trees, shrubs, and grasses that at the narrowest point extends 30 feet from the channel and at the widest point extends over 150 feet from the channel.

Comment periodOpen · to 2026-10-22
Applied2026-09-21DistrictMVNBFT Development, LLC - JD - Westlake Apartments Phase II - Calcasieu
Time extension/use change: apartments replacing commercial, 1.83 ac wetland impactmore

The applicant requests a time extension and change in use authorization to construct four apartment complexes, detention pond, parking areas, walking paths, and green spaces, instead of an originally proposed commercial area. An original permit was authorized on 11 April 2027 for the construction of an apartment complex and areas for commercial development. This new application proposes a change in use from the commercial development at the north of the property to residential development. Additionally, two commercial developments that were authorized, but not built within the original permits time frame, are being proposed with this new application as a time extension. All proposed impacts in the new application were mitigated for in the original authorization, and no new impacts are proposed. The proposed activity change from commercial to residential development would impact approximately 1.83 acres of wetlands previously mitigated for and authorized for fill.

Comment periodOpen · to 2026-10-11
Applied2026-09-14DistrictMVNLand Development Partners LLC, JD D'Agostino, An 18 acre site located off of Loblolly Ln. in Denham Springs, Eaglewood Residential Subdivision - Livingston
Residential subdivision constructionmore

construction of a residential subdivision

Comment periodOpen · to 2026-10-03
Applied2026-09-14DistrictMVNWhite Castle Project Company LLC, Natural Gas Storage - Iberville
Fill and convert wetlands for White Castle Energy Hub gas facility and pipelinesmore

The applicant requests authorization to clear, grade, and fill jurisdictional wetlands for the construction of the White Castle Energy Hub (WCEH) facility and the associated natural gas and brine pipelines and meter station required for facility operations. The applicant is proposing to permanently fill 5.80 acres of forested bottomland hardwood wetlands for the construction of the meter station and limestone access road. The applicant is proposing to convert 27.0 acres of bottomland hardwood wetlands to emergent wetlands for the establishment of a permanent pipeline right-of-way (ROW). Additionally, the applicant is proposing to temporarily impact 18.12 acres of jurisdictional wetlands for the establishment of a temporary workspace for project construction. The WCEH facility will store natural gas to support industrial and energy development projects throughout Louisiana.

Comment periodOpen · to 2026-10-04
Applied2026-08-31DistrictMVNTangipahoa Parish Government - Readiness Center on Arena Road - Tangipahoa
After-the-fact clearing for Florida Parish Arena parkingmore

after-the-fact authorization for clearing and grading activities conducted to develop the Florida Parish Arena. The proposed project includes the development of parking areas and temporary buildings to support community activities and events.

Comment periodClosed · to 2026-09-21
Applied2026-08-24DistrictMVNSt Charles Parish Department of Public Works - Kellogg Pump Station Frontal Protection near the Extension of River Oaks Drive, Luling - St Charles
T-Wall and gate crossing near Cousins Pump Stationmore

The proposed project includes construction of a T-Wall in front of the existing Cousins Pump Station, a gate crossing at Texaco Road that will connect to the previously constructed Ellington Levee Project, and associated infrastructure. The project also includes construction of a sump area on the protected side of the levee to increase stormwater detention capacity and improve drainage of the Lakewood Ridge, Lagatutta Estates, and South Lakewood subdivisions.

Comment periodClosed · to 2026-09-14
Pipeline

Banks proposed on public notice

5 most recent of 12
Proposals recorded
12since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
2of 12
The rest have closed, and remain in review
In RIBITS review
18pending banks
Separate feed — RIBITS bank status
Banks proposed on public notice, 5 rows
AppliedDistrictTypeProposed bankComment period
Applied2026-09-14DistrictMVPTypeBank prospectusDEVMBAElwell Farms Wetland Bank-North
New wetland mitigation bank site constructionmore

Public Notice for the construction of a new wetland mitigation bank site.

Comment periodOpen · to 2026-10-14
Applied2026-09-14DistrictMVPTypeBank prospectusDEVMBAElwell Farms Wetland Bank-South
New wetland mitigation bank site constructionmore

Public Notice for the construction of a new wetland mitigation bank site.

Comment periodOpen · to 2026-10-14
Applied2026-08-14DistrictMVRTypeBank prospectusDEVMBAIllinois River Mitigation Bank
Proposed wetland mitigation bank establishment, Illinoismore

This public notice describes the proposed establishment of a wetland mitigation bank in Illinois.

Comment periodClosed · to 2026-09-12
Applied2026-08-11DistrictMVPTypeBank prospectusDEVMBADonelan LGRWRP Bank
Drain tile removal to restore wetland and prairie hydrology, Minnesotamore

The purpose of this project is to restore the area's natural hydrology and native plant communities. The restoration will involve disabling the existing subsurface drainage systems to re-establish historical wetland conditions. The goal is to create a diverse habitat consisting of fresh wet meadow, shallow marsh, deep marsh, and native upland prairie and forest. This will improve water quality, increase habitat connectivity, and restore the site's ability to retain water. The project is sponsored by the Minnesota Board of Water and Soil Resources (BWSR) in partnership with the landowner, Tim Donelan.

Comment periodClosed · to 2026-09-11
Applied2026-08-03DistrictMVRTypeBank prospectusDEVMBAFunderburg Wetland Bank
Public notice reissuance due to time lapsemore

This public notice is being re-issued due to the length of time between the original public notice posting.

Comment periodClosed · to 2026-08-17
Approvals

Banks finalized in this division

8 of 13
Banks finalized in this division, 8 rows
DecisionDistrictBankStatus nowCredits released
Decision2026-09-26DistrictMVMClover Creek Mitigation BankMVM-2022-227Status nowPendingCredits releasednone yet
Decision2026-09-23DistrictMVRHomeplace Mitigation BankMVR-2024-1097Status nowApprovedCredits releasedStream
Decision2026-07-03DistrictMVPLittle LaCrosse River Headwaters Mitigation BankMVP-2022-2313Status nowApprovedCredits releasedStream, Wetland
Decision2026-06-24DistrictMVMButler County Mitigation BankMVM-2025-101Status nownot in RIBITSCredits releasedno record
Decision2026-06-17DistrictMVPPointe North at Carlos Avery Development/South Branch Sunrise River Mitigation BankMVP-2007-537Status nowApprovedCredits releasednone yet
Decision2026-06-10DistrictMVNRES Barataria, LLC - River Bend Mitigation Bank - St. Charles Canal - St CharlesMVN-2022-769Status nowApprovedCredits releasedWetland
Decision2026-05-20DistrictMVPCurveland Wetland Mitigation BankMVP-2022-321Status nowApprovedCredits releasednone yet
Decision2026-05-09DistrictMVPGavin Farm Wetland BankMVP-2023-1168Status nowApprovedCredits releasednone yet

About the data on this page

Bank details, status and credit balances are mirrored from the USACE RIBITS registry, the federal public record for mitigation banks. Single-client banks are excluded from supply figures. Credit balances count only banks that can sell today — sold-out, suspended, terminated, withdrawn, closed-out and not-yet-approved banks are left out. Credit classes offset different resources and are never added together. Totals across many banks are rounded to whole credits — a single bank’s own balance never is. Approval timelines come from the USACE permit-processing record (ORM). We calculate the median from every bank’s milestone dates in the division. Full clock means from the first public notice of the prospectus to the final decision — it includes the applicant’s own time. Regulator clock means from the complete draft instrument being received to that same final decision — the part the Corps controls. A median is shown only where at least four banks have both milestone dates. In-lieu fee instruments are excluded throughout. Public notices come from the USACE Regulatory Request System (RRS). Notice text is the Corps’ own; the one-line summary beside it is an AI generated summary.

The map on this page is drawn live from the EPA NEPAssist RIBITS MapServer when you load it.

How these figures are builtReport an issue