The read

A bank clears the regulator here in about 10 months — and takes roughly 17 months end to end.

Measured against the national median, the regulator clock sits level with it (1.06×) and the full clock runs 0.82× it — faster than the country.

Regulator clock
303days, median
Draft instrument to decision
n = 28 banks · IQR 206–371
Full clock
524days, median
First public notice to decision
n = 20 banks
Vs national
Regulator: North Atlantic 303 days; National 287 days. Full: North Atlantic 524 days; National 638 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

5 districts
Review time by district, 5 rows
CodeDistrictRegulator clockFull clockBanks
CodeNAONorfolkRegulator clock308 daysFull clock554 daysBanks24
CodeNABBaltimoreRegulator clocknot enough dataFull clocknot enough dataBanks1
CodeNAENew EnglandRegulator clocknot enough dataFull clocknot enough dataBanks1
CodeNANNew YorkRegulator clocknot enough dataFull clocknot enough dataBanks0
CodeNAPPhiladelphiaRegulator clocknot enough dataFull clocknot enough dataBanks2
Supply

Credits available across the division

Wetland
212,693credits
+14.8%year on year
Stream
220,259credits
+14.1%year on year
Demand

Permit applications by district

5 districts
Permit applications by district, 5 rows
CodeDistrictApplicationsOpenShare of division
CodeNANNew YorkApplications23Open6Share of division28%
CodeNAONorfolkApplications21Open3Share of division26%
CodeNAENew EnglandApplications20Open4Share of division25%
CodeNABBaltimoreApplications12Open2Share of division15%
CodeNAPPhiladelphiaApplications5Open0Share of division6%

Recent federal permit applications on public notice

6 most recent of 81
Applications recorded
81since 2026-07-02
Standard permits & EIS · across 5 districts
Open for comment
15of 81
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-11-24DistrictNANAtrium at Navesink
Replace 310-ft bulkhead, pier, and floating dock with 12 finger docksmore

The applicant is requesting a DA permit to remove the existing wooden pier, aluminum access ramp, floating dock, and all supporting timber piles. The existing 310-linear-foot timber bulkhead will be replaced in place with a new steel sheet pile bulkhead capped with concrete. The project also includes the construction of an approximately 1,242-square-foot timber pier consisting of four connected platforms measuring 6-feet-wide by 12 feet long, 6-feet-wide by 121-feet-long, 6-feet-wide by 32- feet-long, and 6-feet-wide by 48-feet-long.The timber pier leads to a 4-foot-wide by 40- foot-long gangway and a floating dock system totaling 2,232 square feet (SF).The main walkway of the floating dock system will measure 6-feet-wide by 204-feet-long. Perpendicular to this main walkway, twelve floating finger docks will be installed: six (6) measuring 4-feet-wide by 40-feet-long (160 SF each), and six (6) measuring 4-feet-wide by 24-feet-long (96 SF each).

Comment periodOpen · to 2026-12-24
Applied2026-11-24DistrictNAERiverfront Recapture Inc. RLI Park Project
24-acre recreational cove and trail system in public park on Connecticut Rivermore

The applicant is requesting a DA permit to create a 24-acre recreational cove and multi-use trail system within an approximately 60-acre public park development adjacent to the Connecticut River.

Comment periodOpen · to 2026-12-24
Applied2026-11-24DistrictNANSuffolk County Department of Public Works- Swan River Upland Dike Maintenance
Upland dike repair with 10-year maintenance and periodic beach nourishmentmore

The applicant is requesting a DA permit, including 10-year maintenance, to repair the previously approved upland dike. The initial work involves excavating 3,000 cubic yards (CY) of clean material from the upland dike, placing 2,300 CY across 26,300 square feet below Spring High Water on the beach in front of the southern dike wall, and stockpiling the remaining 700 CY north of the upland dike. The applicant plans to conduct three (3) additional beach nourishment events within the ten-year maintenance period removing a maximum of approximately 3000 CY per event from the dike and placed within the same placement area in front of the southern dike wall.

Comment periodOpen · to 2026-12-24
Applied2026-11-24DistrictNANPort Liberty Terminal - Howland Hook/Arthur Kill Navigation Channel Widening
Widen area adjacent to Arthur Kill Federal Navigation Channelmore

The applicant is requesting a DA permit to widen the area adjacent to the Arthur Kill Federal Navigation Channel.

Comment periodOpen · to 2026-12-24
Applied2026-11-24DistrictNANHampton Oyster Company LLC
Commercial aquaculture pier constructionmore

construction of pier intended for commercial aquaculture use

Comment periodOpen · to 2026-12-24
Applied2026-11-23DistrictNANPort Authority of New York and New Jersey - Port Newark & Port Elizabeth Maintenance Dredgin
Ten-year maintenance dredging of Port Newark and Port Elizabeth berths, 200,000 CY annuallymore

The applicant is requesting a DA permit to dredge, with ten-years maintenance by mechanical dredge up to 200,000 cubic yards of material from Berths 2-98 at the Port Newark & Port Elizabeth Marine Terminals annually. Dredge depths will range from 35 to 50 feet below the plane of Mean Lower Low Water with two feet of allowable over dredge. Dredged material would be placed into a barge for dewatering. The dredged material would then be amended with Portland cement and transported for disposal at a state approved facility. The total dredge area for all berths is approximately 138 acres.

Comment periodOpen · to 2026-12-23
Pipeline

Banks proposed on public notice

5 most recent of 23
Proposals recorded
23since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
5of 23
The rest have closed, and remain in review
In RIBITS review
19pending banks
Separate feed — RIBITS bank status
Banks proposed on public notice, 5 rows
AppliedDistrictTypeProposed bankComment period
Applied2026-11-24DistrictNAETypeILF instrument modificationMODNH ILF Program
NH ILF program amendment: add Maidstone Bends Conservation Project, Upper Connecticut Rivermore

This notice announces a request to modify the New Hampshire Aquatic Resource Mitigation Fund In-Lieu Fee (ILF) Program Instrument with the addition of the Maidstone Bends Conservation Project in the Upper Connecticut River ILF Program Service Area.

Comment periodOpen · to 2026-12-23
Applied2026-11-19DistrictNAETypeBank prospectusDEVMBAVT Beaver Brook Mitigation Bank
Beaver Brook stream and wetland mitigation bank, Vermontmore

The applicant/sponsor is requesting to establish the Beaver Brook Mitigation Bank to generate compensatory mitigation stream and wetland credits to offset unavoidable aquatic resource impacts permitted within the Vermont Richelieu River Service Area.

Comment periodOpen · to 2026-12-18
Applied2026-11-12DistrictNAOTypeBank prospectusDEVMBAGuards Shore Mitigation Bank Accomack
Tidal wetland restoration, preservation, and buffer for 3.79 creditsmore

The Sponsor is proposing 2.89 acres of tidal wetland restoration, 6.78 acres of tidal wetland preservation, and 0.52 acres of tidal wetland buffer establishment. The Sponsor proposes to generate a total of 3.79 tidal wetland credits upon completion of the activities approved under the mitigation work plan.

Comment periodOpen · to 2026-12-12
Applied2026-11-07DistrictNAOTypeBank prospectusDEVMBAHazelwood Mitigation Bank (nee Joyner)/TNT
Stream and wetland mitigation bank restoration creditsmore

The Sponsor is proposing 917 linear feet (LF) of stream channel restoration and 734 LF of stream enhancement. The restored/enhanced stream will be protected on both sides by wetland creation areas. The Sponsor proposes to generate a total of 1,622 Unified Stream Methodology (USM) credits upon completion of the activities approved under the mitigation work plan. The Sponsor is proposing 2.88 acres of wetland enhancement, 54.86 acres of wetland restoration, 13.06 acres of wetland buffer restoration, 27.99 acres of upland buffer restoration, 93.14 acres of wetland preservation, and 31 acres of upland buffer preservation. The Sponsor proposes to generate a total of 77.02 wetland credits upon completion of the activities approved under the mitigation work plan.

Comment periodClosed · to 2026-11-22
Applied2026-11-06DistrictNAETypeILF instrument modificationMODNH ILF Program
NH ILF program amendment: add Williams Property Project, Pemigewasset-Winnipesaukee Riversmore

This notice announces a request to modify the New Hampshire Aquatic Resource Mitigation Fund In-Lieu Fee (ILF) Program Instrument with the addition of the Williams Property Project in Pemigewasset-Winnipesaukee Rivers ILF Program Service Area.

Comment periodOpen · to 2026-12-06
Approvals

Banks finalized in this division

8 of 10
Banks finalized in this division, 8 rows
DecisionDistrictBankStatus nowCredits released
Decision2026-11-24DistrictNAOMyrtle Mitigation Bank / Suffolk NAO-2025-1582Status nowPendingCredits releasednone yet
Decision2026-10-08DistrictNAOMiddle James Umbrella Mitigation Bank - Natts Branch SiteNAO-2022-2902Status nowApprovedCredits releasednone yet
Decision2026-10-08DistrictNAOMiddle James Umbrella Mitigation Bank - Clover Hill SiteNAO-2026-1673Status nownot in RIBITSCredits releasedno record
Decision2026-09-25DistrictNAOHogue Creek Mitigation Bank NAO-2024-1425Status nowPendingCredits releasednone yet
Decision2026-09-22DistrictNABPatapsco River Mitigation Bank - Barrow SiteNAB-2021-397Status nowApprovedCredits releasedStream, Wetland
Decision2026-09-19DistrictNAOBetween the Bridges Mitigation Bank/ClearwaterNAO-2025-792Status nownot in RIBITSCredits releasedno record
Decision2026-09-18DistrictNAOHorseshoe Mitigation Bank - Phase INAO-2023-2015Status nowPendingCredits releasednone yet
Decision2026-08-21DistrictNAOBoydton Regional Mitigation Bank / MecklenburgNAO-2024-2544Status nowApprovedCredits releasednone yet

About the data on this page

Bank details and credit balances are mirrored from USACE RIBITS. Supply figures exclude single-client banks and banks that cannot currently sell; credit classes are kept separate.

Approval timelines use USACE ORM milestone dates and exclude in-lieu fee instruments. A median is shown only when enough records carry the dates needed to calculate it.

Public notices come from USACE RRS; MitiVision’s one-line notice labels are AI-generated summaries of the Corps’ text.

How these figures are builtReport an issue