USACE mitigation bankingPacific Ocean Division

How long the POD division's districts take to approve a mitigation bank, what credit supply they oversee, and how the districts differ from one another. The clock that matters is the regulator's own — everything else includes time the applicant spends revising.

Figures mirrored from USACE RIBITS · ORM · RRS · synced

The read

Too few completed reviews in this division to report a regulator clock.

Regulator clock
—days, median
Draft instrument to decision
n = 0 banks
Full clock
—days, median
First public notice to decision
n = 0 banks
Vs national
Regulator: Pacific Ocean not available days; National 303 days. Full: Pacific Ocean not available days; National 723 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

1 district
Review time by district, 1 row
CodeDistrictRegulator clockFull clockBanks
CodePOAAlaskaRegulator clocknot enough dataFull clocknot enough dataBanks0
Supply

Credits available across the division

Wetland
2,271credits
−0.4%year on year
Stream
12,291credits
+22.5%year on year
Species
85credits
Demand

Permit applications by district

2 districts
Permit applications by district, 2 rows
CodeDistrictApplicationsOpenShare of division
CodePOAAlaskaApplications13Open6Share of division93%
CodePOHHonoluluApplications1Open0Share of division7%

Recent federal permit applications on public notice

6 most recent of 14
Applications recorded
14since 2026-07-02
Standard permits & EIS · across 2 districts
Open for comment
6of 14
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-09-25DistrictPOAAIDEA, West Susitna Access Project
West Susitna Access Project road constructionmore

The Applicants stated purpose of the West Susitna Access Project is to provide safe, year-round public road access to remote areas of the Matanuska-Susitna Borough". The basic project purpose is of the West Susitna Access Project is transportation for a wide user group consisting of recreational, residential, commercial, and industrial users.

Comment periodOpen · to 2026-10-13
Applied2026-09-25DistrictPOAMary Gates, Waterfront Rehabilitation and Float Plane Dock, Campbell Lake
Shoreline stabilization, boat ramp and floating dock replacementmore

Mary J Gates, stated the purpose is to stabilize an eroding shoreline, restore a preexisting boat ramp, and replace a floating dock to safely moor a floatplane. PROPOSED WORK: The applicant is proposing to stabilize 62 linear feet of shoreline, install a new floating dock and upgrade an existing boat ramp. Shoreline stabilization would be accomplished by excavating 15 cubic yards of the bank and placing 20 cubic yards of riprap. All work would be performed in accordance with the attached plan, sheets 1-4 dated September 2026. Please contact Leah Barrett at (907) 388-9081, toll free from within Alaska at (800) 478-2712, or by email at leah.barrett@usace.army.mil if further information is desired concerning this public notice.

Comment periodOpen · to 2026-10-26
Applied2026-09-22DistrictPOAMazzella Alaska, fill in tidal waters, Wrangell Narrows
Dock removal and rock fill for cannery site accessmore

Andrew Mazzella, Mazzella Alaska, LLC; stated the purpose is to enable parking space for the remainder of the property and make a long-lasting rock approach to the dock & cannery site. PROPOSED WORK: The applicant requests authorization to remove 110 feet of existing dock by removing the wooden piles completely using machinery staged on existing uplands. As the piles are pulled, 3,850 square feet of clean shot rock would be placed and contained using a 5:1 sloped armor rock wall. The fill area would measure 110 feet by 35 feet. All work would be completed during low tide within the dry. Please contact Leah Barrett at (907) 388-9081, toll free from within Alaska at (800) 478-2712, or by email at leah.barrett@usace.army.mil if further information is desired concerning this public notice.

Comment periodOpen · to 2026-10-23
Applied2026-09-18DistrictPOAArctic Mine Development Project, Upper Kobuk River
Notice of Intent to Prepare an EISmore

Special public notice announcing Notice of Intent to Prepare an EIS

Comment periodOpen · to 2026-11-02
Applied2026-09-16DistrictPOAAPMA 2299, Graphite Creek Project
Notice of Intent to Prepare an EISmore

Special Public Notice announcing Notice of Intent to Prepare an EIS

Comment periodOpen · to 2026-11-02
Applied2026-09-01DistrictPOAAmerican Cruise Lines, Petersburg Cruise Ship Dock, Wrangell Narrows, Petersburg, AK
Cruise ship berthing float and pile installationmore

Mr. Eric Dussault stated the purpose is to construct deep-water berthing infrastructure to safely accommodate moorage of cruise ships. PROPOSED WORK: The applicant requests authorization to install a 24-foot-wide by 160-foot-long concrete or wood moorage float, a 10-foot-wide by 100-foot-long aluminum pedestrian transfer bridge (gangway), four (4) 36-inch diameter floating fender dolphins, and four (4) 24-inch steel file frames, for a total of eight (8) 24-inch steel piles, in order to construct a cruise ship dock. Piles would be installed with a vibratory hammer then driven to final near-refusal depth using an impact hammer.

Comment periodOpen · to 2026-10-01
Pipeline

Banks proposed on public notice

Proposals recorded
0since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
0of 0
Nothing recorded in this window
In RIBITS review
0pending banks
Separate feed — RIBITS bank status

No bank or in-lieu-fee proposals were on public notice in this division between 2026-07-02 and 2026-09-28.

Approvals

Banks finalized in this division

No banks were finalized in this division in the six months prior to 2026-09-28.

About the data on this page

Bank details, status and credit balances are mirrored from the USACE RIBITS registry, the federal public record for mitigation banks. Single-client banks are excluded from supply figures. Credit balances count only banks that can sell today — sold-out, suspended, terminated, withdrawn, closed-out and not-yet-approved banks are left out. Credit classes offset different resources and are never added together. Totals across many banks are rounded to whole credits — a single bank’s own balance never is. Approval timelines come from the USACE permit-processing record (ORM). We calculate the median from every bank’s milestone dates in the division. Full clock means from the first public notice of the prospectus to the final decision — it includes the applicant’s own time. Regulator clock means from the complete draft instrument being received to that same final decision — the part the Corps controls. A median is shown only where at least four banks have both milestone dates. In-lieu fee instruments are excluded throughout. Public notices come from the USACE Regulatory Request System (RRS). Notice text is the Corps’ own; the one-line summary beside it is an AI generated summary.

The map on this page is drawn live from the EPA NEPAssist RIBITS MapServer when you load it.

How these figures are builtReport an issue