USACE mitigation bankingSouth Atlantic Division

How long the SAD division's districts take to approve a mitigation bank, what credit supply they oversee, and how the districts differ from one another. The clock that matters is the regulator's own — everything else includes time the applicant spends revising.

Figures mirrored from USACE RIBITS · ORM · RRS · synced

The read

A bank clears the regulator here in about 9 months — and takes roughly 2.7 years end to end.

Measured against the national median, the regulator clock sits level with it (0.95×) and the full clock runs 1.37× it. Districts diverge sharply enough that the division median is a starting point, not a forecast for any one office — Savannah closes in 226 days, Jacksonville in 914.

Regulator clock
289days, median
Draft instrument to decision
n = 32 banks · IQR 219–691
Full clock
992days, median
First public notice to decision
n = 43 banks
Vs national
Regulator: South Atlantic 289 days; National 303 days. Full: South Atlantic 992 days; National 723 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

5 districts
Review time by district, 5 rows
CodeDistrictRegulator clockFull clockBanks
CodeSASSavannahRegulator clock226 daysFull clock709 daysBanks5
CodeSAWWilmingtonRegulator clock254 daysFull clock550 daysBanks17
CodeSAJJacksonvilleRegulator clock914 daysFull clock1,805 daysBanks10
CodeSACCharlestonRegulator clocknot enough dataFull clock1,439 daysBanks9
CodeSAMMobileRegulator clocknot enough dataFull clocknot enough dataBanks2
Supply

Credits available across the division

Wetland
46,842credits
+1.8%year on year
Stream
2,820,315credits
+3.9%year on year
Species
26,504credits
−4.1%year on year
Demand

Permit applications by district

6 districts
Permit applications by district, 6 rows
CodeDistrictApplicationsOpenShare of division
CodeSAJJacksonvilleApplications105Open24Share of division67%
CodeSACCharlestonApplications19Open6Share of division12%
CodeSAMMobileApplications16Open4Share of division10%
CodeSASSavannahApplications9Open2Share of division6%
CodeSAWWilmingtonApplications7Open2Share of division4%
CodeSAACaribbeanApplications1Open0Share of division1%

Recent federal permit applications on public notice

6 most recent of 157
Applications recorded
157since 2026-07-02
Standard permits & EIS · across 6 districts
Open for comment
38of 157
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-09-28DistrictSAJKramer, Kevin - Clay Dairy Parkway Extension, Clay County
Fill wetlands for 4-lane roadway linking First Coast Expressway to SR 16more

The applicant is requesting a DA permit to discharge approximately 175,168.73 cubic yards of fill material into approximately 12.56 acres of palustrine forested wetlands for the construction of a 4-lane divided roadway with paved shoulders, drainage swales, and pedestrian walkways on both sides of the road. The purpose of the proposed roadway is to connect the First Coast Expressway and State Road 16 to appease traffic and alleviate safety concerns within the area.

Comment periodOpen · to 2026-10-13
Applied2026-09-25DistrictSAWNCDOT / U 5791 / SR 2714 / Jacksonville Parkway Ext
NCDOT STIP U-5791 road project in Jacksonville, Onslow Countymore

Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), Wilmington District has received information from the North Carolina Department of Transportation (NCDOT) regarding a potential future requirement for a Department of the Army (DA) permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. 1344). The purpose of this public notice is to solicit comments from the public and information necessary to evaluate the probable impact on the public interest regarding the proposed activity as described below and as shown on the enclosed drawings. State Transportation Improvement Project (STIP) U-5791 located in the northeastern portion of the City of Jacksonville in Onslow County, between Western Boulevard (NC 53) and US 17 adjacent to Jacksonville Commons. The project length is approximately four miles.

Comment periodOpen · to 2026-10-25
Applied2026-09-24DistrictSAJFlorida East Coast Railway Intermodal
Fill placement in 404 waters for railroad intermodal facilitymore

Public notice: Permit application no. SAJ-2025-03148 (SP-JMB) Public Notice, 404 Waters, fill placement, Railroad Intermodal

Comment periodOpen · to 2026-10-26
Applied2026-09-24DistrictSACCRAA Dorchester Road
79-acre wetland fill for airport-support commercial/industrial development, Charlestonmore

The applicant is requesting a DA permit to fill 79 acres of wetlands to construct a commercial and industrial development that would support the Charleston International Airport. The development would allow existing non-aeronautical facilities currently occupying aviation-support areas to be relocated, thus freeing up valuable airport property for future aeronautical needs. The Charleston International Airport has a continuing demand for expansion as a result of increasing tourism to the local area, population growth in the Tri-County area, and ongoing expansion of existing airport tenants such as Boeing.

Comment periodOpen · to 2026-10-09
Applied2026-09-24DistrictSAJHotz, Steven (Island Homes of the Keys Inc.)/Fill
Fill 6,400 sq ft salt marsh for access road to residencemore

To excavate and place 475 cubic yards of fill within a 6,400 square foot disturbed salt marsh area for the construction of a paved access road to provide entree to a proposed single-family residence within an upland area.

Comment periodOpen · to 2026-10-15
Applied2026-09-24DistrictSACDeerfield Sand Mine Expansion
Wetland excavation for Deerfield Sand Mine expansionmore

The applicant is requesting a DA permit to excavate 19.6 acres of wetland for the expansion of the Deerfield Sand Mine.

Comment periodOpen · to 2026-10-08
Pipeline

Banks proposed on public notice

5 most recent of 35
Proposals recorded
35since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
13of 35
The rest have closed, and remain in review
In RIBITS review
15pending banks
Separate feed — RIBITS bank status
Banks proposed on public notice, 5 rows
AppliedDistrictTypeProposed bankComment period
Applied2026-09-25DistrictSAWTypeIn-lieu-fee proposalDEVINLIEUANCDMS Brother Site / Moore
Riparian wetland and stream restoration mitigation project, 21.7 acresmore

The project has been identified for the purpose of providing in-kind mitigation for unavoidable stream and wetland impacts. Permits will be obtained from the NC DWR and USACE to restore waters of the US as well as soil and erosion control permits. The project encompasses 21.7 acres of active pastureland, including the protection, enhancement, preservation, or reestablishment of approximately 10.223 acres of riparian wetlands, and restoration of 4,516 feet of stream.

Comment periodOpen · to 2026-10-25
Applied2026-09-25DistrictSAWTypeBank prospectusDEVMBAGlen Raven Ossipee Mill Dam Mitigation Bank / Glen Raven, Inc. / Alamance County
Remove Ossipee Mill Dam, restore 13,800 ft of Reedy Forkmore

Glen Raven, Inc. proposes to remove the Ossipee Mill Dam and restore lotic conditions to approximately 13,800 linear feet of Reedy Fork. The dam has disrupted sediment transport, degraded water quality, and blocked fish and aquatic species passage since at least 1855. Removal will reconnect Reedy Fork to 260 miles of upstream and 82 miles of downstream aquatic network. The project will also permanently protect the dam footprint and 445 linear feet of adjacent riparian frontage on Glen Raven's property through a conservation easement extending 100 feet from the stream bank, with restoration plantings of native riparian vegetation.

Comment periodOpen · to 2026-10-25
Applied2026-09-22DistrictSAJTypeBank prospectusDEVMBAMitBank - Black Boar
Black Boar mitigation bank proposalmore

Public Notice for Black Boar Mitigation Bank proposal.

Comment periodOpen · to 2026-10-22
Applied2026-09-10DistrictSAJTypeBank prospectusDEVMBAMitBank - Tippen Bay Wetland
Tippen Bay Wetland Mitigation Bank prospectus review, 946.6 acresmore

The proposed project was previously advertised via public notices dated October 30, 2014, and July 15, 2017. However, those proposals were withdrawn. Based on coordination and review associated with the previous proposals, including several draft Mitigation Banking Instruments, the applicant has provided information for this public notice beyond the requirements of a Mitigation Bank Prospectus and commensurate with an MBI. Therefore, the submitted document titled Mitigation Banking Instrument, Tippen Bay Wetland Mitigation Bank will be reviewed under the Mitigation Bank Prospectus phase. The overall goal of the Tippen Bay Wetland Mitigation Bank is to provide appropriate compensatory mitigation for Department of the Army permits through restoration and enhancement of wetland ecosystems and associated upland buffer habitats across 946.6 acres. This will be accomplished through hydrologic improvements, invasive species management, and native vegetation plantings.

Comment periodOpen · to 2026-10-10
Applied2026-09-09DistrictSAWTypeIn-lieu-fee proposalDEVINLIEUAChunk Site / Bladen
Chunk Mitigation Site stream restoration, North Carolinamore

According to the applicant, this project will include a conservation easement area that is estimated to be approximately 35.50 acres. The Chunk Mitigation Site proposes to restore approximately 6,300 linear feet of stream (valley length). Stream restoration efforts are designed to restore a braided, D-type stream system in a low-gradient valley and will be conducted using the Coastal Plain guidelines (USACE et al. 2007). Where it enters the Site, the stream will be diverted from its current ditched location into a historic topographic valley that was identified by QL2 LiDAR (Figure 6, Appendix A) and verified during field investigations. Restoration of the riparian buffers will create an uninterrupted wooded corridor for wildlife. All project assets will be placed under conservation easement that will be protected in perpetuity with the State of North Carolina (NCDEQ Stewardship) who will serve as long-term manager for the mitigation property.

Comment periodOpen · to 2026-10-09
Approvals

Banks finalized in this division

8 of 18
Banks finalized in this division, 8 rows
DecisionDistrictBankStatus nowCredits released
Decision2026-09-26DistrictSACGoose Pond Wetland and Stream Mitigation BankSAC-2017-415Status nowApprovedCredits releasednone yet
Decision2026-09-17DistrictSAW(PCN) South 40 Farm Mitigation Project - Robbinsville - Graham CountySAW-2024-2041Status nowPendingCredits releasednone yet
Decision2026-08-29DistrictSAJMitBank - Round Hammock Mitigation BankSAJ-2020-4839Status nowApprovedCredits releasednone yet
Decision2026-07-25DistrictSACRed Bluff Mitigation BankSAC-2021-522Status nowApprovedCredits releasednone yet
Decision2026-07-25DistrictSACWay TractSAC-2023-78Status nowApprovedCredits releasednone yet
Decision2026-07-21DistrictSACPoes Landing Mitigation BankSAC-2022-1304Status nownot in RIBITSCredits releasedno record
Decision2026-07-21DistrictSAJMitBank - Crystal CoveSAJ-2021-3068Status nowApprovedCredits releasednone yet
Decision2026-07-18DistrictSASBurton Pond Mitigation BankSAS-2021-914Status nowApprovedCredits releasedWetland

About the data on this page

Bank details, status and credit balances are mirrored from the USACE RIBITS registry, the federal public record for mitigation banks. Single-client banks are excluded from supply figures. Credit balances count only banks that can sell today — sold-out, suspended, terminated, withdrawn, closed-out and not-yet-approved banks are left out. Credit classes offset different resources and are never added together. Totals across many banks are rounded to whole credits — a single bank’s own balance never is. Approval timelines come from the USACE permit-processing record (ORM). We calculate the median from every bank’s milestone dates in the division. Full clock means from the first public notice of the prospectus to the final decision — it includes the applicant’s own time. Regulator clock means from the complete draft instrument being received to that same final decision — the part the Corps controls. A median is shown only where at least four banks have both milestone dates. In-lieu fee instruments are excluded throughout. Public notices come from the USACE Regulatory Request System (RRS). Notice text is the Corps’ own; the one-line summary beside it is an AI generated summary.

The map on this page is drawn live from the EPA NEPAssist RIBITS MapServer when you load it.

How these figures are builtReport an issue