USACE mitigation bankingSouth Pacific Division

How long the SPD division's districts take to approve a mitigation bank, what credit supply they oversee, and how the districts differ from one another. The clock that matters is the regulator's own — everything else includes time the applicant spends revising.

Figures mirrored from USACE RIBITS · ORM · RRS · synced

The read

A bank clears the regulator here in about 3.7 years — and takes roughly 3.7 years end to end.

Measured against the national median, the regulator clock runs 4.70× it and the full clock runs 2.13× it.

Regulator clock
1,349days, median
Draft instrument to decision
n = 1 banks · IQR 1,349–1,349
Full clock
1,357days, median
First public notice to decision
n = 3 banks
Vs national
Regulator: South Pacific 1349 days; National 287 days. Full: South Pacific 1357 days; National 638 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

2 districts
Review time by district, 2 rows
CodeDistrictRegulator clockFull clockBanks
CodeSPKSacramentoRegulator clocknot enough dataFull clocknot enough dataBanks2
CodeSPNSan FranciscoRegulator clocknot enough dataFull clocknot enough dataBanks1
Supply

Credits available across the division

Wetland
1,617credits
+1.9%year on year
Stream
2,592credits
+0.6%year on year
Species
17,991credits
+1.5%year on year
Demand

Permit applications by district

4 districts
Permit applications by district, 4 rows
CodeDistrictApplicationsOpenShare of division
CodeSPNSan FranciscoApplications5Open1Share of division36%
CodeSPAAlbuquerqueApplications4Open1Share of division29%
CodeSPLLos AngelesApplications3Open0Share of division21%
CodeSPKSacramentoApplications2Open0Share of division14%

Recent federal permit applications on public notice

6 most recent of 14
Applications recorded
14since 2026-07-02
Standard permits & EIS · across 4 districts
Open for comment
2of 14
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-11-05DistrictSPACascade Village
Cascade Village wetland fill for residential developmentmore

The Cascade Village Tracts A1-B1 project requires Corps authorization to permanently fill 1.97 acres of palustrine emergent marsh (PEM)/ wet meadow wetland and palustrine scrub shrub (PSS)/PEM mix wetlands for development of building foundations, residential yards and road infrastructure. The project would also temporarily impact 0.07 acre of PEM wetland for the installation of utility infrastructure (water, sewer, and storm sewer).

Comment periodOpen · to 2026-12-05
Applied2026-10-28DistrictSPNMartinez Renewable Facility (formerly Tesoro Golden Eagle Refinery)
Closure of five waste management units at Martinez Refinerymore

The Tesoro Refining & Marketing Company LLC has applied to the U.S. Army Corps of Engineers (Corps) San Francisco District, for a 10-year Department of the Army Permit to implement closure of the five WMUs (10/11/14, 31, and 32) compliant with the terms of regulatory orders issued by the RWQCB and USEPA, approximately two miles east of the Benicia-Martinez Bridge and Interstate 680, at the north end of the Martinez Refinery (formerly the Golden Eagle Refinery), in Contra Costa County, California. Closure activities at each of the WMUs would consist of some combination of: (1) consolidating waste material into a smaller footprint for placement of a final cap; (2) backfilling excavated areas resulting from consolidation or removal activities with clean soil and revegetating; (3) processing or amending waste materials to improve its engineering properties for transport and/or supporting an overlying cap; and/or (4) covering the waste with a permanent Title 27 multi-layer cap or a RWQCB-a

Comment periodOpen · to 2026-11-27
Applied2026-10-26DistrictSPACottonwood Creek channel improvements
Cottonwood Creek channel realignment and bank stabilization near Colorado Springsmore

The U.S. Army Corps of Engineers (Corps), Albuquerque District, has received an application from James Morley of Morley Companies requesting Department of the Army authorization pursuant to Section 404 of the Clean Water Act for proposed work affecting wetlands and stream channel associated with Cottonwood Creek in unincorporated El Paso County, Colorado. The proposed project involves realigning and stabilizing approximately 1,300 linear feet of Cottonwood Creek to address ongoing channel degradation and erosion associated with increased stormwater runoff. The proposed work includes construction of a meandering stream channel, widening of the floodplain, installation of three drop structures, placement of riprap bank protection, and associated grading. The applicant proposes permanent impacts to approximately 0.609 acre of wetlands and 0.28 acre of stream channel, totaling approximately 0.889 acre of aquatic resource impacts.

Comment periodClosed · to 2026-11-25
Applied2026-10-23DistrictSPLPort of San Diego (WRDA) Beach and Shoreline Improvements for Harbor Park
Harbor Park shoreline resiliency, revetment and salt marsh creationmore

The applicant is requesting a DA permit to construct the project which consists of rock revetment modification, beach improvement, and creation of a salt marsh to improve resiliency, safe public access, and recreational opportunity along the future Harbor Park shoreline. The project consists of 14.6 acre of redevelopment of the western portion of the existing Bayside Park adjacent to San Diego bay, to what will become the Harbor Park. Detailed descriptions of each project component are included in the attached permit application and supporting documents. The project consists of 4 components, all with the goal of improving the quality of the park shoreline for structural integrity, public access, and environmental quality. The High Tide line (HTL) for the above components is 7.71 ft. MLLW (Mean Lower Low Water) and the Mean High-Water mark is 4.99 ft. MLLW for Corps jurisdiction The specific actions and goals for each project component are listed below which are related to a sea leve

Comment periodClosed · to 2026-11-20
Applied2026-10-16DistrictSPKTimpanogos Sanitary Sewer District
Wastewater pump station and pipelines on Utah Lake shorelinemore

TSSD has applied for a permit to place dredged or fill material in approximately 24.34 acres of waters of the United States to construct a wastewater pump station, pipelines, and road extensions. The approximately 109-acre project site is located along the northeastern shore of Utah Lake, Latitude 40.3483, Longitude -111.8044; Utah County, Utah, and can be seen on the Pelican Point USGS Topographic Quadrangle.

Comment periodClosed · to 2026-11-16
Applied2026-10-16DistrictSPNMcKenzie Bar Gravel Excavation
Gravel extraction on McKenzie bar, Middle Fork Eel Rivermore

Project would be to continue gravel extraction operations on the McKenzie bar, Middle Fork Eel River, Mendocino County.

Comment periodClosed · to 2026-11-13
Pipeline

Banks proposed on public notice

5 most recent of 7
Proposals recorded
7since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
1of 7
The rest have closed, and remain in review
In RIBITS review
1pending banks
Separate feed — RIBITS bank status
Banks proposed on public notice, 5 rows
AppliedDistrictTypeProposed bankComment period
Applied2026-11-02DistrictSPATypeBank prospectusDEVMBAMuddy Creek Mitigation Bank
Muddy Creek Mitigation Bank prospectus, 114.5 acres, Grand County, Coloradomore

The Albuquerque District of the U.S. Army Corps of Engineers (Corps) has received a prospectus for the proposed Muddy Creek Mitigation Bank, pursuant to 33 CFR 332.8(d)(2). The proposed mitigation bank would include a 114.5- acre area that includes portions of Muddy Creek, Milk Creek, and associated wetlands, located approximately 19 miles northwest of the Town of Kremmling, at latitude 40.303987, longitude -106.551948, Grand County, Colorado, Colorado Headwaters 8- digit Hydrologic Unit Code (HUC) 14010001.lThe purpose of this public notice is to solicit comments from the public regarding the work described below. A copy of the Muddy Creek Mitigation Bank prospectus is available for review on the Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) website. https://ribits.ops.usace.army.mil/ords/f?p=107:278:16861153846164:::278:P278_BANK_ID:7546 The Albuquerque District will receive written comments on the proposed work, as outlined above, until December 2, 2026.

Comment periodOpen · to 2026-12-02
Applied2026-10-16DistrictSPKTypeILF instrument modificationMODEast Contra Costa County Habitat Conservation Plan/Natural Community Conservation Plan
East Contra Costa ILF program modification adding two project sitesmore

The East Contra Costa County Habitat Conservancy has requested a modification to the East Contra Costa In-lieu fee (ILF) program instrument to incorporate the Horse Valley and Vaquero Farms In-lieu fee (ILF) projects. The proposed Horse Valley ILF project is located on Roddy Ranch Preserve, off Empire Mine Road at 5851 Horse Valley Road in Section 18, Township 01 North, Range 02 East and Section 13, Township 1 North, Range 1 East; at Latitude 37.9364 and Longitude , -121.8022; in Antioch, Contra Costa County, California. The Vaquero Farms ILF project is located off Vasco Road, in Section 3, Township 1 North, Range 3 East, at Latitude 37.8306, Longitude -121.6225, near Byron, Contra Costa County, California.

Comment periodClosed · to 2026-11-15
Applied2026-10-15DistrictSPKTypeBank prospectusDEVMBALazy K Ranch Mitigation Bank
Lazy K Ranch mitigation bank proposal in Madera/Merced Countiesmore

Lazy K Ranch, LLC has applied for approval of a mitigation bank. The approximately 541-acre bank site is located adjacent to South Santa Fe Avenue on the west, Avenue 28 on the south, and Marguerite Road on the north, approximately five miles east-northeast of Chowchilla, in Madera and Merced Counties, California at approximately Latitude 37.16337, Longitude -120.15301.

Comment periodClosed · to 2026-11-14
Applied2026-09-24DistrictSPKTypeBank prospectusDEVMBAWild Flower Mitigation Bank
Draft Bank Enabling Instrument for Sacramento District mitigation bankmore

The Sacramento District of the U.S. Army Corps of Engineers (Corps) has received a draft Bank Enabling Instrument (DBEI) for a Department of the Army mitigation bank pursuant to 33 CFR 332.8(d)(2). The purpose of this public notice is to solicit comments from the public.

Comment periodClosed · to 2026-10-24
Applied2026-09-16DistrictSPKTypeILF instrument modificationMODSacramento District California In-Lieu Fee Program
Fresno Slough in-lieu fee mitigation site, 59.17 creditsmore

National Fish and Wildlife Foundation has applied for Department of the Army approval to establish the Fresno Slough (KIN-1/SAJ-2) project for the Sacramento District California In-Lieu Fee (ILF) program. The proposed project would generate up to 59.17 aquatic resource credits. The proposed in-lieu fee project site is located south of the Little San Joaquin River and East of Fresno Slough in Sections 28, 29,32, and 33 of Township 13 South, Range15 East; at Latitude 36.7615 and Longitude -120.3465; approximately 2.3 miles south of the town of Mendota in Fresno County, California.

Comment periodClosed · to 2026-10-16
Approvals

Banks finalized in this division

Banks finalized in this division, 2 rows
DecisionDistrictBankStatus nowCredits released
Decision2026-08-11DistrictSPKCache Slough Mitigation BankSPK-2022-357Status nowApprovedCredits releasedMixed
Decision2026-06-25DistrictSPKJohnson Cosumnes Mitigation BankSPK-2023-103Status nowApprovedCredits releasedWetland, Stream

About the data on this page

Bank details and credit balances are mirrored from USACE RIBITS. Supply figures exclude single-client banks and banks that cannot currently sell; credit classes are kept separate.

Approval timelines use USACE ORM milestone dates and exclude in-lieu fee instruments. A median is shown only when enough records carry the dates needed to calculate it.

Public notices come from USACE RRS; MitiVision’s one-line notice labels are AI-generated summaries of the Corps’ text.

How these figures are builtReport an issue