USACE mitigation bankingSouthwestern Division

How long the SWD division's districts take to approve a mitigation bank, what credit supply they oversee, and how the districts differ from one another. The clock that matters is the regulator's own — everything else includes time the applicant spends revising.

Figures mirrored from USACE RIBITS · ORM · RRS · synced

The read

A bank clears the regulator here in about 8 months — and takes roughly 1.5 years end to end.

Measured against the national median, the regulator clock runs 0.81× it — faster than the country and the full clock runs 0.87× it — faster than the country. Districts diverge sharply enough that the division median is a starting point, not a forecast for any one office — Little Rock closes in 185 days, Galveston in 289.

Regulator clock
233days, median
Draft instrument to decision
n = 13 banks · IQR 181–345
Full clock
554days, median
First public notice to decision
n = 21 banks
Vs national
Regulator: Southwestern 233 days; National 287 days. Full: Southwestern 554 days; National 638 days
RegulatorFull
Coverage

Regulatory districts, shaded by review time

Review time by district

3 districts
Review time by district, 3 rows
CodeDistrictRegulator clockFull clockBanks
CodeSWLLittle RockRegulator clock185 daysFull clock499 daysBanks4
CodeSWFFt WorthRegulator clock243 daysFull clock537 daysBanks5
CodeSWGGalvestonRegulator clock289 daysFull clock556 daysBanks13
Supply

Credits available across the division

Wetland
24,276credits
+21.4%year on year
Stream
1,223,982credits
+3.1%year on year
Species
7,272credits
+133.7%year on year
Demand

Permit applications by district

4 districts
Permit applications by district, 4 rows
CodeDistrictApplicationsOpenShare of division
CodeSWGGalvestonApplications26Open2Share of division76%
CodeSWLLittle RockApplications5Open1Share of division15%
CodeSWFFort WorthApplications2Open0Share of division6%
CodeSWTTulsaApplications1Open0Share of division3%

Recent federal permit applications on public notice

6 most recent of 34
Applications recorded
34since 2026-07-02
Standard permits & EIS · across 4 districts
Open for comment
3of 34
The rest have closed, and remain pending
Recent federal permit applications on public notice, 6 rows
AppliedDistrictProjectComment period
Applied2026-11-17DistrictSWGPermit Number: 2041000000; COUNTY OF CAL
Modification of waterfront facilities at Olivia Haterius Parkmore

The applicant proposes to modify existing waterfront facilities at Olivia Haterius Park in Calhoun County.

Comment periodOpen · to 2026-12-17
Applied2026-11-09DistrictSWLJEFFREY SAND COMPANY
Renewal of commercial dredging permitmore

Renewal of Commercial Dredging Permit

Comment periodOpen · to 2026-12-04
Applied2026-11-04DistrictSWGAransas County/ SaveCedarBayou/IP/CedarBayou/Aransas Co.
Modify permit for new DMPA and 10-year maintenance dredgingmore

The applicant proposes to modify the existing permit to include a new upland dredge management placement area (DMPA). In addition, the applicant requests a 10-year maintenance dredging permit. Dredging would be conducted using mechanical methods (clamshell, excavator bucket) or with small-scale, excavator mounted dredge pump/cutterhead attachments. The dredging footprint would be within the existing permitted area and dredging events are expected to produce less than 100,000 cubic yards (CY) of dredge material. The project is estimated to require less than 10 maintenance dredging events over a 10-year period.

Comment periodOpen · to 2026-12-03
Applied2026-10-21DistrictSWLEbbing ANGB Channel - Pond Improvements
Fort Smith Regional Airport drainage improvements, culverts, riprap armoringmore

Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), the Fort Smith Regional Airport, 6700 McKennon Blvd., Suite 200 Fort Smith, Arkansas 72903, has requested authorization for the placement of dredged and fill material in waters of the United States associated with drainage improvements consisting of stream bank armoring and riprap lining of an unnamed perennial stream, replacement of undersized culverts, construction of a new approximately 673 linear foot reinforced concrete box culvert with roadway crossing, replacement of a culvert in an intermittent tributary, and the replacement of a spillway and berm elevation modifications at a water quality retention pond.

Comment periodClosed · to 2026-11-16
Applied2026-10-15DistrictSWGMontgomery County MUD 84/ Bentwood Drainage Channel Improvements - Phase 1/ SP/ Bentwood Channel/ Montgomery County
Bentwood Channel culvert, crossing expansion and channel widening for drainage and erosion controlmore

The applicant proposes to discharge 1,372.11 cubic yards of fill material within 3.91 acres (6,783 linear feet) below the Ordinary High Water Mark (OHWM) of Bentwood Channel for the installation of a new reinforced concrete box (RCB) culvert from a drainage ditch at Lavone Drive to the Bentwood Drainage Channel, expanding the RCB bridge culverts at the Oakhurst Forest Drive and Rock Creek Drive crossings, and widening the side slopes and deepening segments of the Bentwood Drainage Channel within the project area to reduce erosion along the channel and improve storm water drainage.

Comment periodClosed · to 2026-11-14
Applied2026-10-06DistrictSWGPort of Galveston/The Galveston Wharves/SP/Galveston Harbor/Galveston County
Galveston port expansion - LNG berth, Cruise Terminal 14, Pier 18/21 mods, permit extensionmore

The applicant is requesting to modify Department of the Army (DA) Permit SWG-2011-00162. The modification includes a proposed 5-year extension of time for previously authorized work that has not been completed and the addition of new work. Proposed new work is associated with construction of an LNG bunkering and lay berth facility, construction of Cruise Terminal 14, and modifications to Pier 18 and Pier 21 Marina. The applicant is also requesting the continuation of maintenance dredging. The project is intended to provide ongoing improvements for Port of Galveston facilities, including activities necessary to increase cruise terminal capacity and expand shipyard facilities.

Comment periodClosed · to 2026-11-05
Pipeline

Banks proposed on public notice

1 most recent of 1
Proposals recorded
1since 2026-07-02
Bank, ILF and instrument proposals
Open for comment
0of 1
The rest have closed, and remain in review
In RIBITS review
2pending banks
Separate feed — RIBITS bank status
Banks proposed on public notice, 1 row
AppliedDistrictTypeProposed bankComment period
Applied2026-07-29DistrictSWFTypeBank prospectusDEVMBABluebird Mitigation Bank
Proposed wetland mitigation bankmore

Proposed mitigation bank

Comment periodClosed · to 2026-08-28
Approvals

Banks finalized in this division

Banks finalized in this division, 4 rows
DecisionDistrictBankStatus nowCredits released
Decision2026-10-29DistrictSWLARDOT-Black River Mitigation BankSWL-2025-154Status nownot in RIBITSCredits releasedno record
Decision2026-09-26DistrictSWGBank - Crosby Eastgate Mitigation Bank / Harris County Flood Control District/Harris Co.SWG-2016-356Status nowApprovedCredits releasednone yet
Decision2026-09-05DistrictSWLView Point Farms Mitigation Bank ProspectusSWL-2019-216Status nowApprovedCredits releasednone yet
Decision2026-07-24DistrictSWLArDOT-Eleven Point River Mitigation Bank-101115SWL-2021-250Status nowPendingCredits releasednone yet

About the data on this page

Bank details and credit balances are mirrored from USACE RIBITS. Supply figures exclude single-client banks and banks that cannot currently sell; credit classes are kept separate.

Approval timelines use USACE ORM milestone dates and exclude in-lieu fee instruments. A median is shown only when enough records carry the dates needed to calculate it.

Public notices come from USACE RRS; MitiVision’s one-line notice labels are AI-generated summaries of the Corps’ text.

How these figures are builtReport an issue